Getting The Termite Control For Wood To Work

Some Ideas on Termite Control For Wood You Should Know


The dirt underneath and around the concrete slab has to be treated together with the termiticide before the concrete slab is poured. The termiticide has to be applied after installation of this fill substance that was sub-slab. Diluted insecticide is then applied to the fill material. per 10-sq. ft.

Excitement About Termite Control Free InspectionNot known Facts About Termite Control Furniture
Per 10 sq. ft. In addition to treatment underneath the slab, foundation elements are treated as mentioned previously. In addition, a barrier has to be established around foundation elements adjacent to slabs. For information regarding perpendicular treatments, see the TREATMENT OF SOIL ADJACENT TO FOUNDATION ELEMENTS section in this brochure. .

The sub-slab release form is used when concrete slabs are poured without treatment of this dirt for the prevention of subterranean termites during its construction as required under minimum standards for the pre-treatment of constructions. This document informs the property owner of all areas of the property that were not treated to the prevention of subterranean termites during its construction and should only be signed by the home owner. .

One of the most important aspects of performing a prosperous pre-construction termite treatment involves the close working relationship between the PCO and the builder. Several trips are usually necessary in order to perform the different phases of treatment. The different phases and timing of applications are as follows: 1 ). After footing acceptance and before pouring of footings.

Not known Details About Termite Control For Wood


After backfill of foundations in crawl space. 3. After leveling of slab areas. 4. After (or during) backfill and final grading to the outside. Although four trips to the house are shown here, a proper treatment can usually be performed in three trips through careful scheduling. .

Baits/monitoring systems may be used for pre-construction pest control. This system has to be installed following the final level and landscaping is completed. These programs are a recent innovation in termite control. Termiticide baits control termites by eliminating or reducing the size of the termite colony. They do not make a barrier around the structure, as do the liquid insecticides discussed.

The usage of baits can significantly reduce or eliminate the need for a conventional liquid insecticide. .

There are two strategies for the usage of baits. One involves the placement of monitoring devices containing untreated wood or other cellulose material in the dirt around the structure to be shielded. When termites are found in the monitoring device, the untreated cellulose material is substituted with a treated material, known as a"termiticide bait".

The Only Guide to Termite Control Furniture


For the lure system to be effective, the correct number of stations have to be installed and the stations must be inspected or monitored regularly as indicated on the product label. When termites stop feeding, the lure is replaced using untreated wood or other cellulose material. As a variation of this strategy, apparatus may be pre-baited and placed in the soil in areas where termites are present. .

The second bait approach currently in use involves the my company attachment of bait apparatus directly to the face of construction elements where termites are actively feeding. These apparatus are pre-baited and are attached to the foundation walls, floor joists, sub floor and other similar locations. Termites then feed on the bait substance.

There are advantages and disadvantages to the use of termiticide baits. Baits could be utilized to treat constructions that cannot be treated with liquid termiticides due to the presence of a well, inaccessibility of infested regions or concerns about the use of pesticides. However, in the majority of cases, termiticide baits do not provide control of read here the infestation.

Bear in mind the way for the control of subterranean termites is prevention. Listed below are some options which needs to be used in termite control. Preventive measures should include:

Some Ideas on Termite Control For Wood You Should Know


Removal of all stumps, roots, wood, and other cellulose materials from the building site before construction is begun

There should be no contact between the building woodwork and the dirt or fill material. Exterior woodwork should be located a minimum of 6 inches above ground and beams in crawl spaces at least 18 inches above ground to provide ample space to create future inspections

Ventilation openings in foundations should be designed to prevent air pockets that were dead. This helps to keep the ground dry and unfavorable for termites

Thorough annual inspections should be conducted to detect evidence of termite activity like shelter tubes their website on foundation surfaces, either discarded wings or termites

A Biased View of Termite Control Free Inspection


Any wood which contacts the soil, such as fence posts and foundation elements should be Made from pressure treated timber

Proper grading to guide water away form the structureFor additional information or assistance regarding termites and termite control Procedures, please contact us.

Leave a Reply

Your email address will not be published. Required fields are marked *